Economical Vapor-tight Fixture NSF NEMA4X IP65 20W to 90W LED Light

Product Description

Product Description
DLC5.1 listed integrated vapor-tight NSF NEMA4X 20W 25W 30W LED light fixture / economical vapor-tight fixture NSF NEMA4X IP65 20W to 90W LED light
Economical Vapor-tight Fixture NSF NEMA4X IP65 20W to 90W LED Light
Product Detail
Housing Material Plastic
Efficiency(lm/w) 115
Luminous Flux(lm) 2300
Light Source 2835
Cover Material PC
CCT 3500-5000K
Input Voltage 120-277V or 120-347V
Work life time 50000 hours
Certification UL, CUL, DLC, NSF
Warranty 5 years
IP Rating 65
General Information

LED vapor tight is designed for the replacement of traditional fluorescent linear lights used in Garage, Warehouse, Workshop, Food factory, Beverage process area, etc.

Certifications
Economical Vapor-tight Fixture NSF NEMA4X IP65 20W to 90W LED Light
Packaging & Shipping
Package

Heavy thickness paper box package style, styrofoam or strong paper plate inside to hold the lighting fixture, package size at 1210mm*650mm per ctn.

Delivery Time

15-30 days after confirming order. Detail delivery date should be decided according to production season and order quantity.

Economical Vapor-tight Fixture NSF NEMA4X IP65 20W to 90W LED Light
Our Advantages
Economical Vapor-tight Fixture NSF NEMA4X IP65 20W to 90W LED Light
FAQ

Does your factory manufacture both LED lighting fixture and fluorescent lighting fixture?

Yes, we manufacture both LED and fluorescent lighting fixtures.

Do you manufacture SMD LEDs?

Yes, we have our own SMD workshop to manufacture LED strips directly.

What certifications do your products have?

All our products have UL, cUL and DLC certification. Upgraded products conform to DLC5.1 rules.

What is the lead time for sample and mass orders?

Usually sample orders require 5-7 working days, and mass orders require about 28-35 days, depending on the order quantity.

Do you accept OEM or ODM orders?

Yes, OEM and ODM orders are both accepted.

How do you control your quality process?

We use an internal ERP system to manage the entire process, perform 100% inspection for incoming materials, conduct final quality controls, and source components from reliable supply chains.

Related Products